BY LEX MANALO
THE Philippine National Railways (PNR) resumed its services on the Calamba to San Pablo, and Lucena to San Pablo routes starting Wednesday.
The PNR issued a notification that the Calamba to San Pablo route will open at 6:30 p.m. while the Lucena to San Pablo trip will depart at 5:50 p.m.
The PNR also announced that starting September 21, all PNR trips on the above routes are back to normal.
According to an advisory posted by the PNR, the San Pablo-Calamba trip will depart at 6:25 in the morning while the Calamba-San Pablo route will depart at 6:30 in the evening.
The San Pablo-Lucena trip will leave at 6:15 in the morning.
On September 7, the PNR began the suspension of train travel from Calamba to San Pablo and back, due to maintenance activity, while last
September 15 when the PNR suspended the train trip from Lucena to San Pablo.

MOST WANTED FOR CHILD ABUSE IN TARLAC NABBED
2 PRO3 SENIOR OFFICERS GET HIGHER RANK
ILLEGAL GAMBLING CRACKDOWN JAILS 7 IN TARLAC
CL COPS ARREST 19, SEIZE P100-M ILLICIT CIGARETTES IN BULACAN
PRO12’S INTENSIFIED OPERATIONS SEND TO JAIL 7 DRUG TARGETS
PRO3 WEEKLONG OPERATIONS NET 27 SUSPECTS, P4.9-M SMUGGLED CIGARETTES